x x x x x
x x
x
x Projects / Nefit - Buderus
 
x [ Plant design • Line design • Efficiency]    
x

Central Heaters 'on the run' through new assembly concept
Minimal costs for internal transport, a logical layout with overview and growing flexibility. This is the result of a Systematic Layout Planning performed by Ergo-Design at Nefit Buderus in Deventer.

Based on a new production philisophy, material flows and relations between the various departments in the central heaters production plant of Nefit Buderus Deventer were analysed. A global layout plan is designed for minimal transport movements and growing space for new product variants. This plan was created in 3D in Delmia Process Engineer software which made communication with management and suppliers very efficient and realistic. The complete implementation is performed in 1999. The results show substantial capacity growth combined with logistics cost reduction besides the ability to produce in mixed flow.

Related information

x

Ergo-Design B.V. - Industrial Engineering -  P.O.Box 719, 7500AS Enschede, The Netherlands
Phone +31(53)4800550  Fax +31(53)4800559   info@ergodesign.nl  http://www.ergodesign.nl

x
x x x x x